Retrofit first Existing occupied properties · minimum-disruption installation · UK pilot programme

Designed for existing occupied properties

Protect the property you already have.

LOFAZ adds coordinated fire, water, gas and electrical-response pathways to existing homes and small sites — normally without whole-property refurbishment, complete rewiring or replacement of all utility lines.

Retain suitable systems Local-first operation Verified physical response
The honest promise: a property survey confirms compatibility. Limited local pipework, cabling, access panels, valve replacement, electrical work, specialist approval or making good may still be required.
Existing property retrofit plan

Keep what works.
Add what is needed.

Surveyed
PropertyOccupied homeExisting water, gas and electrical services
PriorityWater-first pilotMulti-hazard architecture preserved
RetainCompatible installed alarms, valves and boards
AddApproved sensors, local core, interfaces and backup
EnableVerified action, alerts, roles, evidence and recovery
Typical planned outcomeNo whole-property refurbishment

Final scope is confirmed by survey and competent design.

Everyday customer challenges

Small delays can become expensive incidents.

LOFAZ is designed around what happens after a warning: who knows, what can be contained, whether the action physically occurred and who can restore the property safely.

01 / LEAVING

“Did I leave everything safe?”

After leaving a home or closing a site, people cannot easily confirm water, gas, selected electrical zones and safety pathways from one clear status.

02 / EMPTY PROPERTY

The incident is discovered late.

A vacant, tenanted or remotely managed property can remain exposed for hours before the right person sees the problem and acts.

03 / FIRE RESPONSE

The alarm sounds, but ownership is unclear.

A warning is valuable, yet the practical response can still be delayed when nobody is present or the escalation route is not defined.

04 / WATER DAMAGE

A leak spreads beyond one room.

Water can damage floors, walls and electrical areas, make the property temporarily unusable and continue into neighbouring homes.

05 / RESPONSIBILITY

Everyone is alerted; nobody owns the next step.

Landlord, tenant, manager, installer and emergency contact need a clear order for notification, acknowledgement, escalation and recovery.

06 / AFTER HOURS

The office or cafe is closed.

Water, heat, equipment and utility faults can grow overnight, creating avoidable damage, reopening delays and business interruption.

The retrofit principle

A safety upgrade should not become a second renovation.

LOFAZ starts with installed reality. The system is configured around usable equipment, real access, competent-trade boundaries and the response that the customer actually needs.

01 / RETAIN

Keep suitable installed assets.

Record and reuse compatible infrastructure where condition, access and approved interfaces allow.

  • Fire and CO alarms
  • Water shut-off points and valves
  • Gas-rated interfaces
  • Distribution equipment and communication routes
02 / ADD

Install only the approved gap.

Add the elements required for the commissioned protection pathway, not a blanket replacement package.

  • Local safety core
  • Leak, flow and condition sensors
  • Approved valve or zone interfaces
  • Supervised backup energy
03 / ENABLE

Turn signals into accountable action.

Connect evidence, physical feedback and responsible people into one recoverable event record.

  • Local protective logic
  • Mobile alerts and acknowledgement
  • Role-based escalation
  • Inspection and recovery lock

Normally no whole-property refurbishment.

Survey before promise. Some properties will need limited enabling work because access, age, condition, shared services or compliance requirements vary. That work is identified before installation and separated clearly in the proposal.

Minimum-disruption delivery

Survey first. Add only what is needed.

The final quote separates retained assets, new components, enabling works, excluded works, testing, warranty and maintenance responsibilities.

01 / DISCOVER

Understand

Confirm property type, occupancy, operating hours, priority hazards and responsible people.

02 / SURVEY

Map reality

Inspect alarms, shut-off points, electrical zones, access, signal routes, permissions and condition.

03 / DESIGN

Fix the scope

Define what stays, what is added, local work, roles, cause-and-effect and recovery authority.

04 / INSTALL

Limit disruption

Fit approved components, complete agreed local works and label every safety interface.

05 / COMMISSION

Prove the path

Test local action, physical feedback, alerts, escalation, backup operation, evidence and handover.

Configured protection pathways

One accountable response. Different safety boundaries.

Select a pathway to see the customer outcome and the control boundary. Final behaviour depends on the site survey and approved interfaces.

Commissioned pathwayWATER / W-01

Do not stop at “valve close requested”.

LOFAZ can combine leak and flow evidence, command the configured water valve, distinguish moving from physically closed and check whether the leak is actually contained. If containment is not verified, the event escalates.

DetectValidateContainVerifyNotifyEscalateRecover
Boundary: a physical CLOSED signal does not always prove that water flow has stopped. Sensor health, residual flow, bypasses and commissioned plumbing design matter.

One core. Three service layers.

Built around the buyer and the property.

The workflow, permissions and service level change by customer. The retrofit-first promise and commissioned safety boundary remain consistent.

Homeowners and occupants

Confidence when leaving home.

A single view of configured safety pathways, clear mobile alerts and local protective logic for an existing occupied home.

  • Safe Exit status before leaving
  • Local operation during an internet outage
  • Water-first containment and verified states
  • Authorised recovery after inspection

Commercial value

Benefits that can be measured honestly.

LOFAZ should not claim zero incidents or guaranteed insurance savings. Pilot value is demonstrated through installation, response and operational evidence.

01

Avoided work

Compare the surveyed enabling-work scope with a credible whole-property alternative; record compatible assets retained.

02

Reduced disruption

Measure installer hours, access visits, shutdown windows and the rooms or areas requiring making good.

03

Faster containment

Measure time from signal to requested action, physical feedback, verified containment and responsible-person acknowledgement.

04

Lower incident impact

Track affected zones, water duration, downtime and recovery time while avoiding unsupported prevention claims.

05

Portfolio control

Track tests completed, events acknowledged, repeat faults, escalation timing, service response and recovery authority.

Why LOFAZ

Beyond a collection of point devices.

Retrofit is available elsewhere. LOFAZ must earn selection through the combination of surveyed fit, local coordination, physical result verification, role-based escalation and controlled recovery.

Buyer questionTypical point solutionLOFAZ answer
Can it work with the property I have?Often focused on one device, protocol or hazard.Survey-led retrofit plan that records what stays, what is added and which local works are required.
Did the action physically happen?A command or app status may be the end of the workflow.Requested, executing, physical, verified, failed and recovery-lock states are kept separate.
What happens without the internet?Remote visibility may become the centre of the product.Commissioned local protection can continue; connectivity loss is reported as a separate condition.
Who owns the next step?Multiple people may receive the same generic alert.Role-based acknowledgement, escalation timers, evidence and recovery authority are defined per property.
How is the property restored?Reset and reopen may be treated as a simple remote action.Inspection, permissions, lockouts and evidence determine when and by whom recovery can occur.

LOFAZ is at concept and pre-prototype stage. These are design requirements and proof targets, not claims of a currently certified production system.

Safety and trust

Retrofit reduces unnecessary building work — not professional responsibility.

Every installation remains property-specific. Approved equipment, competent installers, documented tests and clear operational authority are part of the product.

01 / LOCAL FIRST

Protection is not dependent on the phone.

Local logic and supervised backup energy preserve the commissioned response where possible; remote notifications may degrade when connectivity is lost.

02 / FIRE BOUNDARY

The app never discharges suppression.

Any water, foam or CO₂ release remains under a certified local controller and a professionally approved cause-and-effect design.

03 / GAS BOUNDARY

No routine remote reopening after an incident.

Gas-rated hardware, competent design, locked recovery and authorised inspection are required.

04 / ELECTRICAL BOUNDARY

No generic whole-building cut.

Only mapped, professionally designed selective isolation is considered, with essential circuits and safe failure behaviour protected.

05 / CONNECTED SECURITY

Security and update commitments are designed in.

Unique credentials, vulnerability reporting, signed updates, event logs, least privilege and a declared support period form the baseline.

06 / RECOVERY

Closing a valve is not the end of the event.

Inspection, acknowledgement, safe reset, authorised reopening and preserved evidence complete the workflow.

LOFAZ complements compliant alarms, professionally designed systems, risk assessments, qualified installation and emergency response. It is not an emergency service, insurance guarantee or substitute for statutory duties.

Frequently asked questions

Clear answers before a survey.

A final technical answer depends on the property, but the commercial and safety principles should be clear from the start.

Whole-property refurbishment, complete rewiring or replacement of all utility lines is not normally required. A survey may still identify limited local pipework, cabling, access, valve replacement, distribution-board work, specialist approval or making good.

Request a retrofit survey

Start with the property you already have.

Share enough detail for a fit conversation. LOFAZ can then identify what may be retained, what may need to be added and which specialist checks are required.

  • No obligation at this stage
  • Existing occupied and vacant properties
  • Homes, rentals, offices, cafes and portfolios
  • New build supported as a secondary route
Priority protection pathways

Prototype website form: no information is transmitted. Selecting “Prepare enquiry” creates an email draft summary on this device. Do not include emergency or sensitive personal information.